The stresses per square foot, are speaking from memory, less than those which obtain in the case of the Tytam Dam.

I agree, with the Director of Public Works, that the dam should be carried up, at once, to the full height.

The saving, due to leaving off at a lower level, will be small.

The reservoir capacity, even at the full height, is by no means excessive.

If the dam is to serve as a road or path, by completing the dam at once, this roadway can be constructed at its final level, and will not require subsequent alteration.

(8) I presume that trial-pits have been sunk, along the centre line of the dam, and that the depths of foundation, shown on the sheet of sections have been fixed in accordance with their indications. No longitudinal section of the dam is given, so I am unable to ascertain the intentions of the designers, in the matter of foundations. I am however of opinion that in getting out the foundations, stepping should be avoided. The base of the foundations should, as far as possible, be an uniformly inclined line. Abrupt changes of level should be avoided, as far as possible, because sudden variations in depth tend to cause irregular settlement.

(9) No drawing of the waste-weir has been sent to me. I am not therefore in a position to offer any opinion as to its sufficiency.

The position of the waste-weir, as indicated on the general plan, is satisfactory.

Edit History

2026-06-01 04:23:05 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
14 198 The stresses per square foot, are speaking from memory, less than those which obtain in the case of the Tytam Dam. I agree, with the Director of Public Works, that the dam should be carried up, at once, to the full height. The saving, due to leaving off at a lower level, will be small. The reservoir capacity, even at the full height, is by no means excessive. If the dam is to serve as a road or path, by completing the dam at once, this roadway can be constructed at its final level, and will not require subsequent alteration. (8) I presume that trial-pits have been sunk, along the centre line of the dam, and that the depths of foundation, shown on the sheet of sections have been fixed in accordance with their indications. No longitudinal section of the dam is given, so I am unable to ascertain the intentions of the designers, in the matter of foundations. I am however of opinion that in getting out the foundations, stepping should be avoided. The base of the foundations should, as far as possible, be an uniformly inclined line. Abrupt changes of level should be avoided, as far as possible, because sudden variations in depth tend to cause irregular settlement. (9) No drawing of the waste-weir has been sent to me. I am not therefore in a position to offer any opinion as to its sufficiency. The position of the waste-weir, as indicated on the general plan, is satisfactory.
Baseline (Original)
} 4,3 ciposa si ngetgevet satov pilgut 10 1000-1ju sri ni jejame visienne Ieint obokaneg ek Prades-dod 50” OAN ¿OVIDE QUA og jalanvO DE CATA egne most BJ, MAJ · Lara oro"kreedid late „belų und so mIGORLE ¤ ̧À 2003 914 Rosa Piny od palyiqq .20106 008 MİSALIEN ALD,2001 Jamm Vi ko jionea ga mi boJuup JAURA BO Tab acolla? 200,833,A MI DLBOW vloque vileb sojonu nad yd Truaxi,Beders zs pilotšnavidus quisOZMO HANON OHI to veloroes SLOVINART B.AJAC 87.5 eris od RAID10001 (*) -nhea of batiupon od [its 2013aRUBLAD -1:00 OJ TÅLLOVA DEus Iscogove #ON M levak 008 £aupu ,?inque 56J Dia) od pribriator „Jen. on bodies to waniliin üks marş 404 atrijskem od solthus Euroan Ji jentebinake pani quod „TİQQUB Louie ab 30. od belogong sou ni Ji Jend warsí od befy me I of (8) mai token & J06A/BA00 Ji Jenis nolirano son of I aspiel sau, to PG) BadJae JOVICEDOS OJ stev od bluog oizigo and biod I nestal .Just 004 VĹULOK POLOCO2G WOM -ak yinosem Joud, ensoulans Jaon vd ovellad I beinue WIR -000 add wavenony,bertstely od biJoan Join:100 gateis 55 911viot aduca Lt ‚alden vovett vidzivaded 01/ vinveistot al met vinocut one to ublevel 14 198 The stresses per square foot, are speaking from memory, less than those which obtain in the case of the Tytam Dam. I to be rried up full ight at (7) ice. I agree, with the Director of Public Works, that the dam should be carried up, at once, to the full height. level, will be small. The saving, due to leaving off at a lower The reservoir capacity, even at the full height, is by no means excessive. of the dam is to serve as a road or path, the dam at once, this roadway can be constructed at its final level, and will not require, subsequent altera- tion. The creat By completing oundations. (8) I presume that trial-pits have been sunk, along the centre line of the dam, and that the depths of foundation, shewn on the sheet of sections have been No longi- fixed in accordance with their indications, tudinal section of the dam is given, so I am unable to ascertain the intentions of the designers, in the matter of foundations. I am however of opinion that in getting out the foundations, stepping should be avoided. The base of the foundations should, as far Abrupt as possible, be an uniformly inclined line. changes of level should be avoided, as far as possible, because sudden variations in depth tend to cause irregular settlement. ! + J. (2) Left I boa AUREONJ6 edd bedeptJanvist SVAR I Ex می فرستی ,Lejqasda vllaveli لى ايوب OJ Ilu zi lov 19694 946 fac V a no ta irano wri3 3103 Jne vilut Waste weir. * goimub level, Leder and 43 abung konjO DA,de HD WASV o lite and svode Jeet a ni poolt Jewig S (9) No drawing of the waste-weir has been sent to I am not therefore in a position to offer any opinion as to its sufficiency. Bie, The position of the waste-weir as indicated on the general plan, is satisfacoory. 3 f 7
2026-06-01 04:23:05 · Baseline
View content

}

4,3 ciposa si ngetgevet satov pilgut 10 1000-1ju sri

ni jejame visienne Ieint

obokaneg ek Prades-dod 50”

OAN ¿OVIDE QUA og jalanvO DE CATA egne most BJ, MAJ

· Lara oro"kreedid late „belų und so mIGORLE

¤ ̧À 2003 914 Rosa Piny od palyiqq

.20106 008 MİSALIEN ALD,2001 Jamm Vi ko jionea ga mi boJuup

JAURA BO

Tab € acolla? 200,833,A MI DLBOW vloque vileb sojonu tů nad yd Truaxi,Beders dû zs pilotšnavidus quisOZMO

HANON OHI to

veloroes SLOVINART B.AJAC 87.5 eris od RAID10001

(*)

-nhea of batiupon od [its 2013aRUBLAD

-1:00 OJ TÅLLOVA DEus Iscogove #ON M

levak 008 où £aupu

,?inque 56J Dia)

od pribriator „Jen. on bodies to waniliin üks marş 404 atrijskem od solthus Euroan Ji jentebinake pani quod

„TİQQUB Louie ab

30.

od belogong sou ni Ji Jend warsí od befy me I

of

(8)

mai token & J06A/BA00

Ji Jenis nolirano son of I

aspiel sau, to PG) BadJae në JOVICEDOS OJ stev od bluog oizigo and biod I nestal .Just 004 VĹULOK POLOCO2G WOM

-ak yinosem Joud, ensoulans Jaon vd ovellad I beinue WIR -000 add wavenony,bertstely od biJoan Join:100 gateis

55 911viot aduca Lt

‚alden vovett vidzivaded 01/

vinveistot al met vinocut one to ublevel

14

198

The stresses per square foot, are speaking from memory, less than those which obtain in the case of the Tytam

Dam.

I to be rried up

full ight at

(7)

ice.

I agree, with the Director of Public Works, that the dam should be carried up, at once, to the full

height.

level, will be small.

The saving, due to leaving off at a lower

The reservoir capacity,

even

at the full height, is by no means excessive. of the dam is to serve as a road or path,

the dam at once, this roadway can be constructed at its final level, and will not require, subsequent altera-

tion.

The creat

By completing

oundations.

(8) I presume that trial-pits have been sunk, along the centre line of the dam, and that the depths of foundation, shewn on the sheet of sections have been No longi- fixed in accordance with their indications, tudinal section of the dam is given, so I am unable to ascertain the intentions of the designers, in the matter of foundations. I am however of opinion that in getting out the foundations, stepping should be avoided. The base of the foundations should, as far

Abrupt as possible, be an uniformly inclined line. changes of level should be avoided, as far as possible, because sudden variations in depth tend to cause irregular

settlement.

!

+

J.

(2)

Left I boa

AUREONJ6 edd bedeptJanvist SVAR I

Ex

می فرستی

,Lejqasda vllaveli

لى ايوب

OJ Ilu zi lov 19694 946 fac

V

a no ta irano wri3 3103

Jne vilut

Waste weir.

*

goimub level, Leder and 43 abung konjO DA,de HD WASV

o lite and svode Jeet a ni poolt Jewig

S

(9) No drawing of the waste-weir has been sent to

I am not therefore in a position to offer any opinion

as to its sufficiency.

Bie,

The position of the waste-weir

as indicated on the general plan, is satisfacoory.